Home > Shop By Brand >

Cummins ISX QSX Camshaft Timing and Injector Cam Gear Puller Tool Kit
Cummins ISX QSX Camshaft Timing and Injector Cam Gear Puller Tool Kit
 
Tillman Tools Price: $305.99
Manufacturer Part Number: PRO2169
Note: We ship from different warehouses across the country. No local pickups.


SKU: FEPRO2169
Qty:

Description
 

Cummins ISX QSX Camshaft Timing and Injector Cam Gear Puller Tool Kit for all Engines 2007 to 2017 Heavy Duty Alternative to OEM 3163021 3163069 3163020

Used to pull the Injector and valve cam gears on Cummins engines [2007-2017]. Use for setting the gear train timing on all Cummins ISX engines (2007-2017). Set includes 4°, 6° (2 pcs), 7° wedges and crank pin.

Application:1 - Extra 6° wedge is included for [2007-2012] engines with two camshafts. 2 - Freightliner-Cummins ISX. 3 - International-Cummins ISX. 4 - Kenworth Truck -Cummins ISX. OEM Equivalent to Cam Timing Tools 3163021, Cam Gear Puller 3163069 and Crank Pin 3163020. The tool is CNC machined and zinc black electroplated for a strong durable finish.

For Cummins Catalog click here

Looking for Cummins Tools? Please give us a call!! (909) 334-4400

Shop hard to find auto parts, high-end electrician tools, specialty auto-shop supplies and forestry tools at affordable pricing with FREE Selected Shipping. We specialize in auto, aviation, boat & motorcycle, serving the institutions of military, government, emergency response & education for over 50 years. Find vehicle-specific tools, as well as DIY, boutique hand tools, specialty motorcycle tools to get the job done right.

Note:
  • Our vendors continue to have issues with Global Supply Chain across a range of categories and components impacting our ability to provide detailed/ planned delivery timing across a large swath of our Product Portfolio. These categories impacted include (but are not limited to) such lower-level products as: steel, plastic, electrical component, and microprocessor chips. These ongoing issues, often with last minute notification from the supply base, have negatively impacted planned production beyond our control.

Be the first to write a review »