Home > Shop By Category >

OTC 518530 Fuel Injection Hose Assembly with Relief Valve
OTC 518530 Fuel Injection Hose Assembly with Relief Valve

Note: The product title and description supersede the image shown.
The image provided by the manufacturer is not always exact.
We may use the same image for multiple sizes of an item.


 
Tillman Tools Price: $142.92
Manufacturer Part Number: 518530
Note: We ship from different warehouses across the country. No local pickups.


SKU: OTC518530
CALL FOR AVAILABILITY

Description
 

OTC 518530 Fuel Injection Hose Assembly with Relief Valve

  • Included in Model 6550, 6551 & 6552 Fuel Injection Kits
  • Replacement Hose Assembly with Relief Valve and Drain Tube.
  • All Tests, used in conjunction with Gauge PN 518483 (Not included) which comes in Test Kit 6552 or can be purchased separately. Valve used for pressure release and for fuel pump volume tests.
  • Clear Hose helps to allow flow to be seen as well as fuel clarity.

Manufacturer: SPX/Bosch (OTC Rotunda Kent-Moore Miller)

For OTC Tools Catalog click here

Looking for a different OTC Tool? Please give us a call!! (909) 334-4400

Shop hard to find auto parts, high-end electrician tools, specialty auto-shop supplies and forestry tools at affordable pricing with FREE Selected Shipping. We specialize in auto, aviation, boat & motorcycle, serving the institutions of military, government, emergency response & education for over 50 years. Find vehicle-specific tools, as well as DIY, boutique hand tools, specialty motorcycle tools to get the job done right.

Note:
  • Our vendors continue to have issues with Global Supply Chain across a range of categories and components impacting our ability to provide detailed/ planned delivery timing across a large swath of our Product Portfolio. These categories impacted include (but are not limited to) such lower-level products as: steel, plastic, electrical component, and microprocessor chips. These ongoing issues, often with last minute notification from the supply base, have negatively impacted planned production beyond our control.

Be the first to write a review »