Home > Shop By Category >

Schley 17200 Cummings 5.9L & 6.7L ISBE & HPCR Injector Puller
Schley 17200 Cummings 5.9L & 6.7L ISBE & HPCR Injector Puller

Note: The product title and description supersede the image shown.
The image provided by the manufacturer is not always exact.
We may use the same image for multiple sizes of an item.


 
Tillman Tools Price: $100.11
Manufacturer Part Number: 16500
Note: We ship from different warehouses across the country. No local pickups.


SKU: SCH17200
CALL FOR AVAILABILITY

Description
 

Schley 17200 Cummings 5.9L & 6.7L ISBE & HPCR Injector Puller

Designed to remove diesel injectors from Dodge Cummins ISBE HPCR 5.9L and 6.7L engines produced from 2003 to current model year, which are equipped with the high-pressure common rail fuel system.

The 17200 enables the technician to quickly and efficiently remove diesel injectors that have become heavily coated over time with carbon between the tip and head. Simply remove the wires and retaining bolts, then slip the puller cup in the groove on the injector, and lever it out.

For Schley Tools Catalogue click here

Looking for a different Schley tool? Please give us a call!! (909) 334-4400

Shop hard to find auto parts, high-end electrician tools, specialty auto-shop supplies and forestry tools at affordable pricing with FREE Selected Shipping. We specialize in auto, aviation, boat & motorcycle, serving the institutions of military, government, emergency response & education for over 50 years. Find vehicle-specific tools, as well as DIY, boutique hand tools, specialty motorcycle tools to get the job done right.

Note:
  • Our vendors continue to have issues with Global Supply Chain across a range of categories and components impacting our ability to provide detailed/ planned delivery timing across a large swath of our Product Portfolio. These categories impacted include (but are not limited to) such lower-level products as: steel, plastic, electrical component, and microprocessor chips. These ongoing issues, often with last minute notification from the supply base, have negatively impacted planned production beyond our control.

Be the first to write a review »