Home > Shop By Category >

Tillman Mercedes 276589003300 276 589 00 33 00 Inner Chain Check Valve Alt
Tillman Mercedes 276589003300 276 589 00 33 00 Inner Chain Check Valve Alt

Note: The product title and description supersede the image shown.
The image provided by the manufacturer is not always exact.
We may use the same image for multiple sizes of an item.


 
Tillman Tools Price: $91.99
Manufacturer Part Number: TIL276589003300
Note: We ship from different warehouses across the country. No local pickups.


SKU: TIL276589003300
Qty:

Description
 

Tillman Mercedes 276589003300 276 589 00 33 00 Inner Chain Check Valve Alt

Application: Mercedes Benz M276 engine.

Alternative to 276 589 00 33 00 or 276589003300.

This tool is specially designed to install the inner chain check valve at ease. Press the check valve into the hole flush and screw it into the cylinder head surface, and then turn the pressure screw until the plate is flush with cylinder head surface.

Made of top high quality and wear resistance steel, durable and strong enough.

For Mercedes Benz Tools Catalog click here

Looking for a different Mercedes Benz Tool? Please give us a call!! (909) 334-4400

Shop hard to find auto parts, high-end electrician tools, specialty auto-shop supplies and forestry tools at affordable pricing with FREE Selected Shipping. We specialize in auto, aviation, boat & motorcycle, serving the institutions of military, government, emergency response & education for over 50 years. Find vehicle-specific tools, as well as DIY, boutique hand tools, specialty motorcycle tools to get the job done right.

Note:
  • Our vendors continue to have issues with Global Supply Chain across a range of categories and components impacting our ability to provide detailed/ planned delivery timing across a large swath of our Product Portfolio. These categories impacted include (but are not limited to) such lower-level products as: steel, plastic, electrical component, and microprocessor chips. These ongoing issues, often with last minute notification from the supply base, have negatively impacted planned production beyond our control.

Be the first to write a review »