Home > Shop By Brand > Kent-Moore Tools >

Kent-Moore J-44525-A Allison C1 Backing Plate Selector Tool
Kent-Moore J-44525-A Allison C1 Backing Plate Selector Tool

Note: The product title and description supersede the image shown.
The image provided by the manufacturer is not always exact.
We may use the same image for multiple sizes of an item.


 
Tillman Tools Price: $1,058.49
Manufacturer Part Number: J-44525-A
Note: We ship from different warehouses across the country. No local pickups.


SKU: KMTJ-44525-A
Qty:

Description
 

Kent-Moore J-44525-A Allison C1 Backing Plate Selector Tool

J-44525-A has been classified by Allison Transmission as an Essential Overhaul Tool servicing the following product lines: 1000/2000 Series

Backing plate Tool - 'C1 Backing Plate Selector Tool - (NOTE: The kit includes a clamping tool, a 4-tab selection tool, a 5-tab selection tool (silver), a pressure plate, and another pressure plate (silver).

The silver components of this kit were shipped via an Essential Tool Shipment as a J47158 Kit, refer to the following.) (NOTE: If you have the J44525 Kit and the J47159 Kit, then you do not need to order the J44525-A Kit.) (See NOTE #2, this tool/kit includes a non-required revision)

For Kent-Moore catalog click here

Looking for Kent-Moore Tools ? Please give us a call!! (909) 334-4400

Shop hard to find auto parts, high-end electrician tools, specialty auto-shop supplies and forestry tools at affordable pricing with FREE Selected Shipping. We specialize in auto, aviation, boat & motorcycle, serving the institutions of military,

Note:
  • Our vendors continue to have issues with Global Supply Chain across a range of categories and components impacting our ability to provide detailed/ planned delivery timing across a large swath of our Product Portfolio. These categories impacted include (but are not limited to) such lower-level products as: steel, plastic, electrical component, and microprocessor chips. These ongoing issues, often with last minute notification from the supply base, have negatively impacted planned production beyond our control.

Be the first to write a review »