Home > Shop By Brand > Mopar Tools >

Mopar Tools 6973 Engine Cradle Bracket
Mopar Tools 6973 Engine Cradle Bracket

Note: The product title and description supersede the image shown.
The image provided by the manufacturer is not always exact.
We may use the same image for multiple sizes of an item.


 
Tillman Tools Price: $18.60
Manufacturer Part Number: 6973
Note: We ship from different warehouses across the country. No local pickups.


SKU: MST6973
Qty:

Description
 

Mopar Tools 6973 Engine Cradle Bracket

Use this bracket with the 6135 engine dolly and 6710A cradle while removing and installing powertrain assemblies in vehicles equipped with 2.5 Liter, V-6 Mitsubishi engines. 1997 thru 2000

  • 2007 (200, 200 Convertible, Avenger, Sebring, Sebring Convertible, Compass/Patriot, Caliber) - System (9 - Engine - 2.0L Diesel)
  • 2008 (200, 200 Convertible, Avenger, Sebring, Sebring Convertible, Compass/Patriot, Caliber) - System (9 - Engine - 2.0L Diesel)
  • 2009 (Journey, 200, 200 Convertible, Avenger, Sebring, Sebring Convertible, Compass/Patriot, Caliber) - System (9 - Engine - 2.0L Diesel)
  • 2010 (Journey, 200, 200 Convertible, Avenger, Sebring, Sebring Convertible) - System (9 - Engine - 2.0L Diesel)

Do not use power tools. Breakage due to use of power tools voids your warranty.

For Dodge Tools Catalog click here

For Chrysler Tools Catalog click here

For Jeep Tools Catalog click here

Looking for a different Dodge, Chrysler or Jeep tool? Please give us a call!! (909) 334-4400

Shop hard to find auto parts, high-end electrician tools, specialty auto-shop supplies and forestry tools at affordable pricing with FREE Selected Shipping. We specialize in auto, aviation, boat & motorcycle, serving the institutions of military, government, emergency response & education for over 50 years. Find vehicle-specific tools, as well as DIY, boutique hand tools, specialty motorcycle tools to get the job done right.

Note:
  • Our vendors continue to have issues with Global Supply Chain across a range of categories and components impacting our ability to provide detailed/ planned delivery timing across a large swath of our Product Portfolio. These categories impacted include (but are not limited to) such lower-level products as: steel, plastic, electrical component, and microprocessor chips. These ongoing issues, often with last minute notification from the supply base, have negatively impacted planned production beyond our control.

Be the first to write a review »