Home > Shop By Category >

Schley 13500 Toyota Water Pump Pulley Wrench
Schley 13500 Toyota Water Pump Pulley Wrench

Note: The product title and description supersede the image shown.
The image provided by the manufacturer is not always exact.
We may use the same image for multiple sizes of an item.


 
Tillman Tools Price: $65.11
Manufacturer Part Number: 13500
Note: We ship from different warehouses across the country. No local pickups.


SKU: SCH13500
Qty:

Description
 

Schley 13500 Toyota Water Pump Pulley Wrench

his tool is designed to assist in the removal of the water pump pulley bolts on the 2.4ltr 2AZ engine used in the TOYOTA Camry and many other model’s built from 2002 to 2011.

Many water pumps are driven by the back side of a serpentine belt making the pulley easily damaged if held with the incorrect tool when removing or installing the bolts.

Features:

  • Fixed pin dimension for quick easy installation
  • Unique bend to clear engine compartment obstacle’s
  • Head Shaped for generous clearance around the bolts
  • The right tool for the job saves time and money

For Schley Tools Catalogue click here

Looking for a different Schley tool? Please give us a call!! (909) 334-4400

Shop hard to find auto parts, high-end electrician tools, specialty auto-shop supplies and forestry tools at affordable pricing with FREE Selected Shipping. We specialize in auto, aviation, boat & motorcycle, serving the institutions of military, government, emergency response & education for over 50 years. Find vehicle-specific tools, as well as DIY, boutique hand tools, specialty motorcycle tools to get the job done right.

Note:
  • Our vendors continue to have issues with Global Supply Chain across a range of categories and components impacting our ability to provide detailed/ planned delivery timing across a large swath of our Product Portfolio. These categories impacted include (but are not limited to) such lower-level products as: steel, plastic, electrical component, and microprocessor chips. These ongoing issues, often with last minute notification from the supply base, have negatively impacted planned production beyond our control.

Be the first to write a review »