Home > Shop By Category >

Freedom AM-4800 Diesel Engine Setting Locking Tool Kit for 2.0L, 2.2L, 2.7L, 3.0L and 3.2L
Freedom AM-4800 Diesel Engine Setting Locking Tool Kit for 2.0L, 2.2L, 2.7L, 3.0L and 3.2L

Note: The product title and description supersede the image shown.
The image provided by the manufacturer is not always exact.
We may use the same image for multiple sizes of an item.


 
Tillman Tools Price: $99.51
Manufacturer Part Number: AM-4800
Note: We ship from different warehouses across the country. No local pickups.


SKU: SLNAM-4800
Qty:

Description
 

Freedom AM-4800 Diesel Engine Setting Locking Tool Kit for 2.0L, 2.2L, 2.7L, 3.0L and 3.2L

Includes the equivalent of 111589031500 / 8920 Camshaft Locking Pin Set , 602589004000 / 8933 Flywheel Locking Retaining Tool , and 601589024000 / 8932 Flywheel Locking Retaining Tool , for a total of three great tools! Also includes plastic storage case.

Applications: Mercedes; CDi - C-Class 2.0 (03-08), 2.2 (98-04), 2.2 (03-08), 2.2 (07-09), 2.7 (00-06), CLK 2.2 (05-09), 2.7 (02-06), E-Class 2.0 (02-09), 2.2 (98-03), 2.2 (02-09), 2.7 (98-03), 2.7 (02-09), 3.0 (02-09), 3.2 (98-03), 3.2 (02-09), G-Wagen 2.7 (01-05), M-Class 2.7 (99-05), S-Class 3.2 (99-03), 3.2 (02-06), Sprinter 2.7 (99-06), V-Class 2.2 (99-03), Viano 2.0 (03-09), 2.2 (03-09), Vito 2.2 (99-03), 2.2 (03-09), Chrysler; CRD - PT Cruiser 2.2 (02-08), Jeep Grand Cherokee 2.7 (01-05)

Tillman Tools is your one source for auto mechanic and body shop tools, shop equipment, industrial tools and shop supplies. Specialists in vehicle specific mechanic tools, shop tools, industrial tools and shop equipment.

Note:
  • Our vendors continue to have issues with Global Supply Chain across a range of categories and components impacting our ability to provide detailed/ planned delivery timing across a large swath of our Product Portfolio. These categories impacted include (but are not limited to) such lower-level products as: steel, plastic, electrical component, and microprocessor chips. These ongoing issues, often with last minute notification from the supply base, have negatively impacted planned production beyond our control.

Be the first to write a review »