Home > Shop By Category >

Time-Sert 4001 M11 x 2.0MM GM INLINE 6 LL8 Thread Repair Kit
Time-Sert 4001 M11 x 2.0MM GM INLINE 6 LL8 Thread Repair Kit

Note: The product title and description supersede the image shown.
The image provided by the manufacturer is not always exact.
We may use the same image for multiple sizes of an item.


 
Tillman Tools Price: $642.16
Manufacturer Part Number: 4001
Note: We ship from different warehouses across the country. No local pickups.


SKU: TIM4001
Qty:

Description
 

Time-Sert 4001 M11 x 2.0MM GM INLINE 6 LL8 Thread Repair Kit

The Time-Sert 4001 M11 x 2.0 head bolt thread repair kit for GM INLINE 6 LL8 engines. Time-Sert 4001 kit includes fourteen (14) Time-Sert 112030 carbon steel head bolt inserts. It is approximately 15mm to the first thread in the GM Inline 6 LL8 engines.

NOTES:

  1. The Time-Sert 4001 thread repair kit is for a GM Straight In-Line 6-cylinder LL8 M11 x 2.0 engines.NOTE: Two (2) dowel pins are needed when repairing ONE (1) side of the engine. Four (4) dowel are needed when repairing BOTH sides of the block.
  2. The Time-Sert 4001 thread repair kit is for a GM Straight In-Line 6-cylinder LL8 M11 x 2.0 engines.
  3. Two (2) dowel pins are needed when repairing ONE (1) side of the engine. Four (4) dowel are needed when repairing BOTH sides of the block.

Time-Sert 4001 M11 x 2.0 Head Bolt Thread Repair Kit For Use In:

  • 2002 - 2004 GMC Envoy
  • 2002 - 2004 Trail Blazer

Tillman Tools is a convenient resource for your shop tools. You can easily order equipment online and have the products delivered right to your address.

Note:
  • Our vendors continue to have issues with Global Supply Chain across a range of categories and components impacting our ability to provide detailed/ planned delivery timing across a large swath of our Product Portfolio. These categories impacted include (but are not limited to) such lower-level products as: steel, plastic, electrical component, and microprocessor chips. These ongoing issues, often with last minute notification from the supply base, have negatively impacted planned production beyond our control.

Be the first to write a review »